|
KGD KGD Developments |
|||
|
Roger Gale is giving a presentation at the 6th China Tunnel Summit in Shanghai during 29th - 30th March 2012 KGD announce NEW AE technology at the 6th China Summit which can double the time between FILTER CLEANING |
||
Tunnel Electrostatic Filtration Reference List (KGD Design Staff)Stack system/exhaustFestnings Tunnel, OSLO, Norway Elbe Tunnel (evaluation of gas cleaning), Hamburg, Germany Bye-pass systemGranfoss Tunnel (North), OSLO, Norway Ekerberg Tunnel (North), OSLO, Norway Ekerberg Tunnel (South), OSLO, Norway Laerdal Tunnel (with NOx cleaning), Laerdal, Norway Yong Pyong Tunnel, Yong Pyong Expressway, Korea Gyungju Tunnel, Gyungju, Korea Soorak Tunnel, Seoul, Korea Madrid Calle M30 (KGD's IEP technology used for the filter) Ceiling mountedHell Tunnel (1), Trondheim, Norway Hell Tunnel (2), Trondheim, Norway Hell Tunnel (3), Trondheim, Norway Nygaards Tunnel, Bergen, Norway Drammen Tunnel (1), Norway Drammen Tunnel (2), Drammen, Norway Drammen Tunnel (3), Drammen, Norway Drammen Tunnel (4), Drammen, Norway |
|||
| TRION RANGE INDUSTRIAL EQUIPEMENT AVAILABLE | |||